 has become commonplace as a method of installation. This growth has been driven by the benefits offered to utility owners (such as the elimination of traffic disruption and minimal surface damage) and by the ingenuity of contractors in developing this technology.
I’m not saying that HDD is the best solution in every case, because it’s not. But there are so many opportunities for cost savings and quickly completing projects that it is an option that shouldn’t be overlooked.
Some say that technology in the industry has outgrown necessary damage prevention training needed to ensure that already buried utilities lines aren’t damaged in the rush to place newer or bigger utility lines.
The really good contractors, whether open trench or HDD, all say the first step to any successful project is to call 811 before you dig. They understand the value of waiting the appropriate time for the underground utility lines to be marked.
While locators are becoming more accurate, it’s still important
to see exactly where the line or pipe is located. As a result, the contractor will properly expose (pothole) the underground utility to determine the horizontal and vertical location of the utility.
Some municipalities and utility companies do not consider potholing to be an option. Rather, it is viewed as an essential phase of underground construction for all types of excavation including horizontal directional drilling (HDD) operations.
Yes sir, these new boring rigs coupled with utilizing best practices, like calling 811 and then boring safely make them worth their weight in holes...
Bore safely!
UTILITY & PIPELINE LOCATOR TRAINING
FULL OSHA CONSTRUCTION LIBRARY
EXCAVATION SAFETY TRAINING
UTA DISTANCE LEARNING CENTER WORK SMARTER !
888-882-8777 info@utasearch.com www.damagepreventiontraining.com
2022, Issue 4
Mississippi 811 • 9



















































































   9   10   11   12   13